Overview
Title
To reform leasing, permitting, and judicial review for certain energy and minerals projects, and for other purposes.
ELI5 AI
The "Energy Permitting Reform Act of 2024" is a new rule that tries to make it quicker and easier for people to start projects that help make energy, like windmills and gas plants, by giving them special time limits and rules. It wants everyone who helps make energy to work together better and make sure we don't miss important things about nature or the environment.
Summary AI
The "Energy Permitting Reform Act of 2024" aims to make significant changes to the leasing, permitting, and review processes for energy and mineral projects in the United States. It seeks to streamline and speed up the approval of projects like onshore and offshore energy developments, renewable energy, and mineral extraction by setting deadlines for decisions, promoting renewable energy on federal lands, and improving coordination among federal agencies. Additionally, the bill addresses issues related to hydropower and liquefied natural gas exports, such as extending licenses and establishing timelines for export approvals. Overall, the bill intends to improve the efficiency of energy project development while considering environmental impacts.
Published
Keywords AI
Sources
Bill Statistics
Size
Language
Complexity
AnalysisAI
General Summary of the Bill
The Energy Permitting Reform Act of 2024 is a legislative proposal aimed at reforming the leasing, permitting, and judicial review processes for various energy and mineral projects in the United States. The bill seeks to streamline procedures across multiple sectors, including onshore and offshore oil and gas leasing, renewable energy development, electric transmission, and hydropower initiatives. Among its objectives are accelerating claims, improving coordination for renewable energy projects on federal lands, enhancing electric transmission infrastructure, and addressing staffing and resource challenges at key energy-related agencies.
Summary of Significant Issues
One of the key issues with the bill is its requirement for guaranteed annual lease sales for both oil and gas and offshore wind energy from 2025 to 2029. Critics argue this could lead to unnecessary environmental harm and financial waste if actual market demand does not match the mandated supply. Furthermore, the bill allows Indian tribes to grant rights-of-way without federal oversight, potentially leading to inconsistencies in how these rights are managed across different regions.
Another point of contention lies in the automatic approval of natural gas export applications if the Commission fails to act within a given timeframe. This provision might bypass necessary regulatory scrutiny, risking unanticipated environmental or market consequences. Additionally, the bill's flexibility regarding the Bonneville Power Administration's compensation structure raises concerns about unchecked spending and possible favoritism.
Impact on the Public
Broadly, the bill may streamline the process of developing energy projects, contributing to quicker deployment and potentially accelerating energy independence goals. However, the lack of flexibility in annual energy lease requirements could lead to an overcommitment to fossil fuel production, potentially hindering environmental conservation efforts.
The bill's emphasis on speeding up project approvals and reducing bureaucratic delays might be seen as beneficial for businesses aiming to reduce lead times for project implementation. However, this could also lead to decisions being made without ample environmental review, possibly resulting in long-term ecological impacts that affect communities situated near these projects.
Impact on Specific Stakeholders
Energy Companies: Energy firms, especially those in oil, gas, and renewable segments, might benefit from reduced red tape and expedited leasing and permitting processes. This change should lower project development costs and timelines, enabling faster market entry and potential revenue from new exploration or renewable sites.
Tribal Entities: Indian tribes would gain more autonomy to grant rights-of-way on their lands, enhancing their ability to manage land use directly. However, the absence of a federal oversight mechanism might introduce disparities in how tribes implement these new permissions.
Environmental Advocates: This group might raise objections regarding the reduction of environmental reviews for project approvals and the potential increase in fossil fuel activities. The categorical exclusions for certain renewable projects might curtail more comprehensive environmental oversight, failing to account for cumulative ecological impacts.
Local Communities: Communities near proposed energy projects could experience mixed impacts. On the positive side, the projects may create local jobs and boost economic development. On the negative side, reduced permitting periods and less stringent reviews could lead to unforeseen consequences like habitat disruption or increased pollution.
In conclusion, while the Energy Permitting Reform Act of 2024 aims to expedite energy project approvals and stimulate economic growth, it raises significant issues concerning environmental oversight, regional disparities in implementation, and potential regulatory loopholes. Such concerns necessitate careful consideration and potential amendments to ensure balanced and effective energy development moving forward.
Issues
Section 301: The section mandates at least one oil and gas lease sale each year from 2025 to 2029 without consideration of changes in demand or environmental impact, potentially leading to wasteful spending or negative environmental effects.
Section 205: The amendment allows Indian tribes to grant rights-of-way without the approval of the Secretary of the Interior, which might result in inconsistent application and enforcement of standards across different tribes and insufficient oversight.
Section 401: The exclusion of ERCOT utilities from jurisdiction could lead to potential loopholes in regulatory oversight within specified areas, affecting the consistency of national transmission planning efforts.
Section 302: The requirement for at least one offshore wind lease sale per year from 2025 to 2029 does not take into account environmental, economic, or logistical challenges that could delay sales or lead to wasteful spending if demand is not aligned.
Section 206: The provision for categorical exclusions under NEPA for certain renewable projects could limit necessary environmental reviews, potentially overlooking impacts or context-specific considerations.
Section 601: The automatic granting of natural gas export applications if the Commission fails to act within a deadline may pose regulatory risks due to lack of thorough assessments.
Section 802: The new compensation flexibility at the Bonneville Power Administration could lead to increased salaries without clear caps, potentially resulting in excessive spending and raising concerns about favoritism.
Section 101: The definition of 'authorization' includes numerous specific acts and statutes, leading to potential confusion if relevant acts are omitted or misinterpreted, possibly resulting in inconsistencies.
Section 101: The expedited judicial review process could pressure agencies into making hastier decisions, potentially compromising the thoroughness of evaluations.
Sections
Sections are presented as they are annotated in the original legislative text. Any missing headers, numbers, or non-consecutive order is due to the original text.
1. Short title; table of contents Read Opens in new tab
Summary AI
The Energy Permitting Reform Act of 2024 includes various sections aimed at speeding up the process for energy-related permits and leases. It covers onshore and offshore energy leasing, renewable energy coordination, electric transmission planning, reliability assessments, liquefied natural gas exports, and hydropower licenses, indicating a broad effort to improve the permitting system across the energy sector.
101. Accelerating claims Read Opens in new tab
Summary AI
The section outlines the process for obtaining necessary authorizations for various projects related to energy, carbon capture, and mineral extraction. It establishes a 150-day deadline to file legal actions seeking judicial review of final agency decisions on these authorizations, mandates expedited court reviews, and sets strict timelines for agencies to act on remanded decisions. Additionally, it treats the creation of supplemental environmental documents as separate final actions and requires agencies to inform project sponsors of any related legal actions within 30 days.
201. Onshore oil and gas leasing Read Opens in new tab
Summary AI
The text describes changes to laws about leasing land for oil and gas. It includes rules for how land is divided for leasing, ensures that lease terms follow management plans, and explains how fees are refunded if someone else wins the bid for a lease after interest is expressed.
202. Term of application for permit to drill Read Opens in new tab
Summary AI
The section amends the Mineral Leasing Act to state that a permit to drill is valid for a single non-renewable 4-year period from the date it is approved. This rule also applies retroactively to permits approved in the two years before the law was enacted, as well as pending applications submitted before the enactment date.
203. Permitting compliance on non-Federal land Read Opens in new tab
Summary AI
The section states that the Secretary of the Interior cannot require a permit to drill for oil and gas on non-Federal land, given certain conditions are met, such as the Federal Government owning less than 50% of the minerals in the area. It also specifies that this rule does not apply to Indian lands and ensures that other authorities and royalty obligations remain unaffected. Additionally, amendments are made to the Mineral Leasing Act to limit the Secretary's authority over non-Federal land in specific situations.
204. Coal leases on Federal land Read Opens in new tab
Summary AI
The section amends the Mineral Leasing Act to establish deadlines for the Secretary of the Interior to process requests for coal lease sales and modifications, requiring certain evaluations and decisions to be made within specific time frames. It also updates language to consistently refer to the Secretary of the Interior in various provisions and corrects a typographical error.
205. Rights-of-way across Indian land Read Opens in new tab
Summary AI
The section amends the Act of February 5, 1948, by stating that Indian tribes can grant rights-of-way on their land without needing approval from the Secretary of the Interior, as long as the tribe's approval process follows certain federal regulations or has its own approved regulations.
206. Accelerating renewable energy permitting Read Opens in new tab
Summary AI
This section outlines the procedures for speeding up the permitting process for renewable energy projects on federal land. It sets specific timelines for reviewing applications, specifies what happens if additional information is needed, and establishes guidelines for low disturbance activities that could qualify for simplified environmental review.
207. Improving renewable energy coordination on Federal land Read Opens in new tab
Summary AI
The text outlines a national goal to produce at least 50 gigawatts of renewable energy on Federal land by 2030, with periodic revisions to this goal. It also introduces standards for reviewing renewable energy projects, clarifies existing authority for community engagement, and updates the definition of eligible projects to include storage, while ensuring existing legal limitations remain unaffected.
208. Geothermal leasing and permitting improvements Read Opens in new tab
Summary AI
The bill aims to improve geothermal leasing and permitting by implementing faster decision timelines for drilling permits, establishing annual leasing, and creating a process for simultaneous project phase reviews. It also mandates the appointment of a Geothermal Ombudsman to manage permit disputes, streamline processes, and report on progress, along with authorizing cost recovery fees to cover administrative costs.
24. Rules and regulations Read Opens in new tab
Summary AI
The Secretary is responsible for establishing rules and regulations as outlined in this section.
209. Electric grid projects Read Opens in new tab
Summary AI
In this section, the bill explains how projects involving the electric grid can use faster environmental approval processes. It defines "previously disturbed or developed" areas and outlines that certain activities, like placing or upgrading electric facilities and developing energy storage on these lands, can get simpler environmental reviews.
210. Hardrock mining mill sites Read Opens in new tab
Summary AI
The section outlines changes to the rules for hardrock mining mill sites on public land, specifying that additional mill sites can be located if necessary for mining operations but cannot exceed 5 acres each. It also establishes a fund for abandoned mines and details the allocation of fees and funds related to these sites.
301. Offshore oil and gas leasing Read Opens in new tab
Summary AI
The section requires the Secretary of the Interior to conduct at least one offshore oil and gas lease sale every year from 2025 to 2029. Each sale must offer the same terms as a previous Gulf of Mexico lease sale and issue leases to the highest bidders within 90 days if the bids meet certain criteria.
302. Offshore wind energy Read Opens in new tab
Summary AI
The text outlines that starting immediately, the Secretary will be required to hold at least one lease sale for offshore wind energy every year from 2025 to 2029, with no less than 400,000 acres overall offered yearly for leasing. Additionally, the Secretary must set an initial goal for 30 gigawatts of offshore wind energy production and regularly update these goals, while amendments to existing laws allow for electricity transmission rights-of-way in certain marine areas.
401. Transmission permitting Read Opens in new tab
Summary AI
The section modifies several aspects of the Federal Power Act, focusing on the process for permitting and managing electric transmission projects. It outlines the roles of the Federal Energy Regulatory Commission and other agencies, sets criteria for approving transmission projects, addresses cost allocation and benefits, and clarifies jurisdictional authority while excluding retail sales from its scope.
402. Transmission planning Read Opens in new tab
Summary AI
The document outlines amendments to the Federal Power Act, introducing requirements for the Secretary of Energy to study and report on electric transmission capacity issues, and for the Federal Energy Regulatory Commission (FERC) to oversee joint planning between neighboring transmission regions. It highlights the importance of improving grid reliability, affordability, and resilience while ensuring fair cost allocation and customer protection in new or modified transmission projects.
224. Transmission study Read Opens in new tab
Summary AI
The section requires the Secretary of Energy to study and report on issues with electric transmission capacity and congestion every three years, in consultation with states, Indian Tribes, and regional entities. The report can identify areas struggling with or expected to struggle with these issues, impacting consumers negatively.
225. Planning for transmission facilities that enhance grid reliability, affordability, and resilience Read Opens in new tab
Summary AI
The section outlines how the Federal Energy Regulatory Commission (FERC) will manage and coordinate planning for interregional transmission facilities to enhance reliability, affordability, and resilience of the electric grid. It requires neighboring regions to plan together, submit interregional plans for approval, and ensure fair cost allocation, with provisions for dispute resolution and deadlines for plan submission and updates.
501. Reliability assessments Read Opens in new tab
Summary AI
The section amends the Federal Power Act to require the Electric Reliability Organization (ERO) to regularly evaluate the reliability of North America's bulk-power system. If a Federal agency's proposed rule might harm system reliability, the ERO must assess and report on its potential effects, considering input from affected organizations and mitigating measures, and then publish the report.
601. Action on applications Read Opens in new tab
Summary AI
The section amends the Natural Gas Act to require the Commission to make a decision on applications to export or re-export natural gas within 90 days after certain conditions are met. If the Commission does not act within this timeframe, the application will automatically be approved.
602. Supplemental reviews Read Opens in new tab
Summary AI
Section 602 discusses the Department of Energy's process for conducting additional reviews on liquefied natural gas (LNG) exports in the United States. It defines key terms and specifies that before finalizing any new reviews, the Secretary of Energy must make proposed reviews available for public comment and ensure that they undergo a peer review. The reviews will focus on economic impacts and greenhouse gas emissions of LNG exports, utilizing existing studies until new assessments are completed.
701. Hydropower license extensions Read Opens in new tab
Summary AI
The text allows the Federal Energy Regulatory Commission to extend the time for starting construction on certain hydropower projects by an additional four years, beyond the originally authorized eight years, if requested by the project licensee. It also allows for the reinstatement of licenses that expired between December 31, 2023, and the enactment date of this law.
1. Short title; table of contents Read Opens in new tab
Summary AI
The Energy Permitting Reform Act of 2024 aims to streamline the process for energy-related activities in the U.S., including onshore and offshore energy leasing and permitting, improving coordination for renewable energy, and enhancing electric transmission planning. The act also addresses issues related to staffing and hiring at energy-related agencies and seeks to remove barriers to hydropower development.
101. Accelerating claims Read Opens in new tab
Summary AI
The section outlines rules for speeding up the approval process for projects that require federal authorization, like building energy infrastructure or managing forest resources. It defines key terms, sets a 150-day deadline for legal challenges to agency decisions, mandates expedited court reviews, and ensures quick handling of any remanded agency actions, while also allowing projects to be part of the FAST Act's permitting process.
201. Onshore oil and gas leasing Read Opens in new tab
Summary AI
The section outlines changes to the rules surrounding onshore oil and gas leasing. It specifies that parcels of land nominated for leasing should not be broken up unless part of them is unavailable for leasing, requires lease terms to follow resource management plans, and sets up a refund process for the expression of interest fee if someone else wins the lease bid.
202. Term of application for permit to drill Read Opens in new tab
Summary AI
The amendment to Section 17(p) of the Mineral Leasing Act establishes that a permit to drill is valid for a single, non-renewable period of four years starting from its approval date. This rule also applies retroactively to all valid, unexpired permits and pending applications existing at the time the amendment takes effect.
203. Permitting compliance on non-Federal land Read Opens in new tab
Summary AI
The section states that the Secretary of the Interior cannot require a permit to drill for oil and gas on non-Federal land, given certain conditions are met, such as the Federal Government owning less than 50% of the minerals in the area. It also specifies that this rule does not apply to Indian lands and ensures that other authorities and royalty obligations remain unaffected. Additionally, amendments are made to the Mineral Leasing Act to limit the Secretary's authority over non-Federal land in specific situations.
204. Coal leases on Federal land Read Opens in new tab
Summary AI
The section amends the Mineral Leasing Act to establish deadlines for the Secretary of the Interior to process requests for coal lease sales and modifications, requiring certain evaluations and decisions to be made within specific time frames. It also updates language to consistently refer to the Secretary of the Interior in various provisions and corrects a typographical error.
205. Rights-of-way across Indian land Read Opens in new tab
Summary AI
The section amends the rights-of-way rules across Indian land by allowing Indian tribes to grant rights-of-way without needing approval from the Secretary of the Interior if they follow approved Tribal regulations. It outlines the process for submitting and approving these regulations, the Secretary's role in enforcing or canceling agreements, and ensures Tribal sovereignty and environmental protection while establishing criteria for compensation and compliance review.
1. Rights-of-way for all purposes across Indian Land Read Opens in new tab
Summary AI
The section gives the Secretary of the Interior the authority to grant rights-of-way for various purposes on Indian Land.
8. Tribal grants of rights-of-way Read Opens in new tab
Summary AI
Indian tribes can grant rights-of-way across their lands without needing approval from the Secretary of the Interior if they follow Tribal regulations that the Secretary has approved. These regulations must include an environmental review process. The Secretary may review compliance and take action if regulations are violated but is generally not liable for losses related to these rights-of-way. Additionally, the Secretary can accept or enforce rights-of-way under tribal consent without affecting the tribe's sovereignty or jurisdiction.
206. Accelerating renewable energy permitting Read Opens in new tab
Summary AI
The section details how the U.S. government aims to speed up the process for approving renewable energy projects. It mandates quicker reviews of applications, requires cost agreements if needed, and lays out specific low-impact activities that can bypass lengthy environmental reviews, as long as they meet certain conditions.
207. Improving renewable energy coordination on Federal land Read Opens in new tab
Summary AI
The text outlines a national goal to produce at least 50 gigawatts of renewable energy on Federal land by 2030, with periodic revisions to this goal. It also introduces standards for reviewing renewable energy projects, clarifies existing authority for community engagement, and updates the definition of eligible projects to include storage, while ensuring existing legal limitations remain unaffected.
208. Geothermal leasing and permitting improvements Read Opens in new tab
Summary AI
The bill outlines several measures to enhance geothermal leasing and permitting. These include creating exclusions for preliminary activities under the National Environmental Policy Act, adjusting leasing schedules to ensure annual sales, setting deadlines for processing drilling permits, establishing rules for cost recovery from applicants, developing a federal permitting process for different project phases, ensuring geothermal projects have the same consideration as oil and gas under existing laws, and appointing a Geothermal Ombudsman to oversee and improve the permitting process.
24. Rules and regulations Read Opens in new tab
Summary AI
The Secretary is responsible for establishing rules and regulations as outlined in this section.
209. Electric grid projects Read Opens in new tab
Summary AI
The section outlines that specific activities related to electric grid projects are eligible for simplified environmental review procedures. These activities include installing or modifying electric facilities within designated areas, repairing existing infrastructure, and constructing energy storage systems on land that has been previously used.
210. Hardrock mining mill sites Read Opens in new tab
Summary AI
The bill amends existing laws to define and regulate the use of public land for hardrock mining mill sites, setting limits on size and operational requirements, and establishes an Abandoned Hardrock Mine Fund for environmental cleanup, which is funded by fees collected from mill sites. It also makes clerical amendments to existing law to ensure consistency in terminology and fee structure.
301. Offshore oil and gas leasing Read Opens in new tab
Summary AI
The section requires the Secretary of the Interior to conduct at least one offshore oil and gas lease sale every year from 2025 to 2029. Each sale must offer the same terms as a previous Gulf of Mexico lease sale and issue leases to the highest bidders within 90 days if the bids meet certain criteria.
302. Offshore wind energy Read Opens in new tab
Summary AI
The section mandates the Secretary to conduct at least one offshore wind lease sale each year from 2025 to 2029, offering a minimum of 400,000 acres annually, and to establish a production goal of 30 gigawatts of offshore wind energy. It also allows for the leasing of areas within marine sanctuaries under certain conditions, and clarifies the duration of permits related to electric transmission cables.
401. Transmission permitting Read Opens in new tab
Summary AI
The section updates regulations for electric transmission projects. It gives more power to the Federal Energy Regulatory Commission to permit and allocate costs for these projects while ensuring state input is considered. It also clarifies jurisdiction and aims to enhance energy reliability and efficiency, but it does not affect the Commission's authority over retail electricity sales.
402. Transmission planning Read Opens in new tab
Summary AI
The section describes requirements for the U.S. Secretary of Energy to conduct regular studies and issue reports on electric transmission capacity constraints and congestion, consulting with affected states and tribes. It also outlines rules for interregional transmission planning to improve grid reliability, affordability, and resilience, including mandatory planning submissions, cost allocations, and potential dispute resolutions overseen by the Federal Energy Regulatory Commission.
224. Transmission study Read Opens in new tab
Summary AI
The Secretary of Energy must study and report on electric transmission capacity issues and congestion every three years, consulting with states, Indian Tribes, and regional entities to identify areas with problems that affect consumers, including considerations specific to Alaska.
225. Planning for transmission facilities that enhance grid reliability, affordability, and resilience Read Opens in new tab
Summary AI
The section outlines rules for the Federal Energy Regulatory Commission (FERC) to help plan and improve transmission facilities that boost electricity grid reliability and affordability. It includes requirements for joint planning between transmission regions, cost allocation rules, and a deadline for submitting plans while excluding Texas's main grid, ERCOT, from these rules.
501. Reliability assessments Read Opens in new tab
Summary AI
The section amends the Federal Power Act to require the Electric Reliability Organization (ERO) to regularly evaluate the reliability of North America's bulk-power system. If a Federal agency's proposed rule might harm system reliability, the ERO must assess and report on its potential effects, considering input from affected organizations and mitigating measures, and then publish the report.
601. Action on applications Read Opens in new tab
Summary AI
The section amends the Natural Gas Act to require the Commission to decide on applications related to exporting natural gas within 90 days of specific events, such as the publication of environmental review notices or the application's receipt date. If the Commission does not make a decision by the deadline, the application is automatically considered approved.
602. Supplemental reviews Read Opens in new tab
Summary AI
Section 602 discusses the Department of Energy's process for conducting additional reviews on liquefied natural gas (LNG) exports in the United States. It defines key terms and specifies that before finalizing any new reviews, the Secretary of Energy must make proposed reviews available for public comment and ensure that they undergo a peer review. The reviews will focus on economic impacts and greenhouse gas emissions of LNG exports, utilizing existing studies until new assessments are completed.
701. Hydropower license extensions Read Opens in new tab
Summary AI
The section allows the Federal Energy Regulatory Commission to grant a 4-year extension for the start of construction on certain hydropower projects licensed before March 13, 2020, if requested by the licensee. Additionally, it permits the Commission to reinstate and extend licenses for projects where the required start date passed between December 31, 2023, and the enactment of this law.
702. Identifying and removing market barriers to hydropower Read Opens in new tab
Summary AI
The section discusses efforts to identify and reduce obstacles to the development of hydropower technologies. It requires the Federal Energy Regulatory Commission, in consultation with the Secretary of Energy, to report on these market barriers and suggest ways to encourage and properly compensate hydropower development, and it involves public input in preparing this report.
703. Regulations to align timetables Read Opens in new tab
Summary AI
The section requires the Federal Energy Regulatory Commission to create regulations to ensure that all licensing decisions are made within 180 days after an environmental document is published. The Commission must also report to Congress on any obstacles to meeting these deadlines, and include information on any missed deadlines in their annual report, without changing any existing legal obligations.
801. Federal Energy Regulatory Commission staffing Read Opens in new tab
Summary AI
The bill modifies the Department of Energy Organization Act by removing a particular paragraph and renumbering another, and it also expands the required qualifications for certification by adding economics and legal studies to the list.
802. Compensation flexibility to address retention and hiring issues at the Bonneville Power Administration Read Opens in new tab
Summary AI
The section updates the Bonneville Project Act of 1937 to allow the Bonneville Power Administration to develop and regularly update a compensation plan for its employees. This plan is designed to be competitive and based on surveys of similar positions while considering education, experience, and geographic differences; it also gives the administrator the flexibility to appoint and set compensation for employees without following some civil service laws.
10. Employment of personnel Read Opens in new tab
Summary AI
The section outlines how the administrator is responsible for developing and updating a compensation plan for employees, including factors such as industry standards and recruitment needs, while also permitting the hiring of staff, laborers, and experts without adhering to usual civil service rules. It specifies that the plan needs to be reviewed and published annually, and allows the hiring of physicians to examine certain employees.
803. Northwest Power and Conservation Council Read Opens in new tab
Summary AI
The section amends the Pacific Northwest Electric Power Planning and Conservation Act by requiring adjustments for inflation starting from the enactment date of the Energy Permitting Reform Act of 2024.
804. Federal Energy Regulatory Commission personnel safety Read Opens in new tab
Summary AI
The section allows the Federal Energy Regulatory Commission to give its employees permission to act as law enforcement officers if needed to protect the safety of its Chairman and Commissioners while they are doing their official work.